Challenge

Warehouse Relocation and Upgrades

The relocation and upgrade of the packaged goods warehouse. TWD provided complete project management and engineering services for required upgrades to warehouse.

Outcome

Successful Project Completion with Efficiency and Compliance

The project adhered to a swift timeline, meeting budget and schedule constraints successfully, even in the face of highly demanding deadlines. Code compliance reviews ensured that every aspect adhered to regulatory standards, building services were optimized, the custom storage rack design added a tailored efficiency to the storage space, fire protection systems were implemented adding an extra layer of safety to the facility, a thorough Capital Cost Estimate laid the groundwork for financial planning and feasibility, regulatory permitting was seamlessly navigated, and procuring all major equipment items and securing major construction contracts exemplified strategic project management. Together, these facets converge to signify a well-rounded and successful project outcome.

Result
50,000 Sq. Ft.
Warehouse.
1,600 Sq. Ft.
Office space.
7500 lb. per Bay Capacity
The rack loading capacity is set at 5000 lb. per bay, which is based on accommodating two pallets per bay, each weighing 2500 lb. This configuration leads to a load of 7500 lb. per post.