Project

Vandergrift Mill Plant Expansion

New HGBA (Heavy Gauge Bright Annealing) furnace and processing line at an existing building

Location
Vandergrift, PA
Client
ATI
Challenge

Installation of Annealing Furnace System & Material Handling Equipment

Installation of new electrical equipment and a vast network of cable tray to minimize conduit, Ebner vertical annealing furnace system, and various HPL material handling equipment in very congested spaces

Outcome

2-Year Site Support & Installation of ABB Substations for Furnace & Processing Line

TWD provided 2 years site support during excavation for electrical grounding, embedded conduit and temporary construction power needs with the installation 2 parallel 6900 V, 2500 kva ABB substations with switchgear, as well as design all above grade field routed conduit and electrical room for switchgear, MCC’s, I/O cabinets, VFD drives, LP’s and DPP’s for the installation of the new HGBA  furnace and processing line at an existing building.

Result
6,900 V, 2,500 kVA Substations
The setup includes two parallel 6,900 V, 2,500 kVA ABB substations equipped with switchgear.
2
Years site support.
$58M
Total installed cost.